• Careers
  • Fugro Global
  • Global

Fugro adds cable-lay to its trenching services

Fugro has added cable-lay services to trenching for offshore windfarm and tidal energy sectors.

13 Jul 2015
Aberdeen, UK

The company has equipped its trenching vessel, Fugro Saltire, with a compact, custom-made, cable-lay spread that comprises a reel drive system to store the cables, a tensioner to lay them, twin winches and a quadrant deployment system on rails. The equipment is fitted to the rear deck of the vessel alongside the existing trenching equipment.

In operation the cables are initially pulled into the base of the wind turbine generators (WTG) and then laid along the seabed using Fugro Saltire’s dynamic positioning system to line them up accurately with the destination WTG. They are then pulled in using the quadrant system to manage the cable during over-boarding and pull-in. The quadrant’s compact design and deployment allows Fugro to control the cable very precisely while pulling in the second end.

An important additional innovation introduced to the system is new 3D sonar technology to supplement ROV support, and monitor precisely, onsite, cable touch down during the cable-lay and pull-in operations, where the daily hazard of very high currents can limit the use of an ROV.

The initial concept for the new cable-lay capability was developed during trenching operations at the Humber Gateway Offshore Wind Farm, when E.ON asked Fugro to investigate laying some cables from the Fugro Saltire. Fugro’s engineers fitted the cable-lay equipment in only six weeks, ahead of E.ON’s deadlines, and cable-laying was completed by February 2015.

“The mobilisation of the cable-lay spread on the Fugro Saltire has widened our successful working relationship with E.ON on the Humber Gateway project. As well as trenching 77 array cables, we installed eight array cables along with second end pull-ins of cables already laid by other contractors,” said Mike Daniel, Trenching Business Line Manager at Fugro Subsea Services. “We can now offer clients simultaneous cable-laying and burial from a single vessel, or alternatively our larger subsea construction vessel Fugro Symphony can be laying cables, while the Fugro Saltire is trenching them, speeding up operations and saving time for our customers.”

 

For more information

Media

Edward Legierse
Contact

+31 (0) 70 31 11147

Investors

Catrien van Buttingha Wichers
Contact

+31 (0) 70 31 15335

 

Share this page

Learn about Fugro

Case studies

Explore our global expertise in this collection of real-world projects where we illustrate solutions for clients across many industry sectors.

More Information

Fugro World

Regular articles providing insight and thought leadership on industry trends, challenges and innovations.

More Information

Press Releases

Browse the latest press releases from Fugro to learn about our investor announcements and the quarterly financial figures.

More Information

Keep up to date with the latest news and stories from Fugro, direct to your inbox